Products
Home / Products / Mobile Crawler Crane /

XLC260 Construction Crawler Crane 260T Hydraulic Control System

XLC260 Construction Crawler Crane 260T Hydraulic Control System

Brand Name: XCMG
Model Number: XLC260
MOQ: One Crane
Price: 200,000-6,000,000 RMB per unit
Payment Terms: L/C,T/T
Supply Ability: Supply According to Customer Needs
Detail Information
Place of Origin:
China
Maximum Wind Speed For Operation:
Up To 20 M/s
Control System:
Hydraulic
Maximum Lifting Height:
Up To 120 Meters
Engine Power:
Up To 500 KW
Outrigger Length:
Up To 10 Meters
Maximum Working Radius:
Up To 80 Meters
Travel Speed:
Up To 80 Km/h
Boom Length:
Up To 100 Meters
Counterweight:
Up To 100 Tons
Maximum Gradeability:
Up To 30%
Packaging Details:
Packing According to Customer Requirements
Highlight:

XLC260 Construction Crawler Crane

,

Construction Crawler Crane 260T

,

260T Hydraulic Crawler Crane

Product Description
Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System
260T Crawler Crane Plays A Key Role In Power Engineering Installation
XLC260 Crawler Crane Technical Specifications
Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m
Main boom working condition - Characteristics of boom end pulley auxiliary hook with main boom main hook (HBS/2)
Main boom working condition with main boom main hook HBS/2 - 65t+30t arm end pulley auxiliary hook performance
Operating radius (m) 23 26 29 32 35 38 41 44 47 50 53
Main boom working condition with main boom main hook HBS/2 - 65t+30t arm end pulley auxiliary hook performance
Operating radius (m) 56 59 62 65 68 71 74 77* 80*
Important Notes:
  1. The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.
  2. The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.
  3. The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.
  4. The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
  5. The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.