Products
Home / Products / 300T Crawler Crane /

Used 300t Boom Crawler Crane Inject New Vitality Into Engineering Construction

Used 300t Boom Crawler Crane Inject New Vitality Into Engineering Construction

Brand Name: XCMG
Model Number: XGC300
MOQ: One Crane
Price: 200,000-6,000,000 RMB per unit
Supply Ability: Supply According to Customer Needs
Detail Information
Place of Origin:
China
Packaging Details:
Packing According to Customer Requirements
Highlight:

300t boom crawler crane

,

engineering construction boom crawler crane

Product Description
Used 300t Boom Crawler Crane Inject New Vitality Into Engineering Construction
XGC 300t Crawler Crane Technical Specifications
Crawler crane models: XGC 300t
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m
Typical working conditions
1. Main boom working conditions
A. Combination table of main boom sections without arm end pulley
Name and quantityMain boom assemblyMain boom bottom section 10.5mMain boom intermediate section 3mMain boom intermediate section 6mMain boom intermediate section 12mAMain boom intermediate section 12mBMain boom reducer 7mMain boom connection 1.5mArm pulley block
HB1910000111
HB2211000111
HB2512[0]0[1]00111
HB2813[1]0[1]00111
HB3112[0]1[0]0[1]0111
HB3413[1]1[0]0[1]0111
HB3712[0]0[1]1[1]0111
HB4013[1]0[1]10111
HB4312[0]1[0]1[2]0111
HB4613[1]1[0]1[2]0111
HB4912[0]0[1]20111
HB5213[1]0[1]20111
HB5512[0]1[0]2[3]0111
HB5813[1]1[0]2[3]0111
HB6112[0]0[1]30111
HB6413[1]0[1]30111
HB6712[0]1[0]30[1]111
HB7013[1]1[0]30[1]111
HB7312[0]0[1]31111
HB7613[1]0[1]31111
*HB7912[0]1[0]31[2]111
*HB8213[1]1[0]31[2]111
*HB8512[0]0[1]32111
*HB8811132111
*HB9112132111
*HB9413132111
  • The "*" main boom combination requires a 1.33m waist rope.
  • The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the main boom reducer section.
  • Two 3m main boom intermediate sections can be used to replace one 6m main boom intermediate section, or two 6m main boom intermediate sections can be used to replace one 12mA main boom intermediate section, but attention must be paid to the matching of the pull plate and the pin number.
  • To ensure that the boom combination function is maximized, it is recommended to purchase main boom lengths of 70m, 67m, and 64m.
B. Combination table of main boom sections with arm end pulleys
Name and quantityMain boom assemblyMain boom bottom section 10.5mMain boom intermediate section 3mMain boom intermediate section 6mMain boom intermediate section 12mAMain boom intermediate section 12mBMain boom reducer 7mMain boom connection 1.5mArm pulley blockArm end pulley
HBS2512[0]0[1]001111
HBS2813[1]0[1]001111
HBS3112[0]1[0]0[1]01111
HBS3413[1]1[0]0[1]01111
HBS3712[0]0[1]1[1]01111
HBS4013[1]0[1]101111
HBS4312[0]1[0]1[2]01111
HBS4613[1]1[0]1[2]01111
HBS4912[0]0[1]201111
HBS5213[1]0[1]201111
HBS5512[0]1[0]2[3]01111
HBS5813[1]1[0]2[3]01111
HBS6112[0]0[1]301111
HBS6413[1]0[1]301111
HBS6712[0]1[0]30[1]1111
HBS7013[1]1[0]30[1]1111
HBS7312[0]0[1]311111
HBS7613[1]0[1]311111
*HBS7912[0]1[0]31[2]1111
*HBS8213[1]1[0]31[2]1111
*HBS8512[0]0[1]321111
*HBS88111321111
  • The "*" main boom combination requires a 1.33m waist rope.
  • The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the main boom reducer.
  • Two main boom intermediate sections of 3m can be used to replace one main boom intermediate section of 6m, and two main boom intermediate sections of 6m can be used to replace one main boom intermediate section of 12mA, but attention must be paid to the matching of the pull plate and the pin number.
  • To ensure the maximum function of the boom combination, it is recommended that users purchase the main boom length of 64m and 70m.