Products
Home / Products / Hydraulic Crawler Crane /

Well Maintained 220T Crawler Crane Second Hand Equipment Hydraulic Crawler

Well Maintained 220T Crawler Crane Second Hand Equipment Hydraulic Crawler

Brand Name: XCMG
Model Number: XLC220
MOQ: One Crane
Price: 200,000-6,000,000 RMB per unit
Payment Terms: L/C,T/T
Supply Ability: Supply According to Customer Needs
Detail Information
Place of Origin:
China
Max. Lifting Capacity:
220 Tons
Heavy Boom Length:
24-84m
Rammer Hoisting Height:
20m
Total Mass:
530t
Main Boom Length:
19-28m
Max Hoisting Torque:
1300(t.m)
Rated Hammer Weight:
20t
Gross Weight:
254t
Packaging Details:
Packing According to Customer Requirements
Highlight:

220T crawler crane second hand

,

Well maintained crawler crane

,

220T hydraulic crawler

Product Description
Well Maintained 220T Crawler Crane Second Hand Equipment Hydraulic Crawler
Well-maintained 220T Crawler Crane, Second-hand Equipment, Quality Assurance
XLC220 Crawler Crane Technical Specifications
Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m
Typical working conditions
Main boom working condition_No arm end pulley HB/1_65t+21t main boom main hook performance
Operating radius(m) 56 59 62 65 68 71* 74* 77* 80* 83*
10 89.4 81.5 81.5 68.5
1. When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2. The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.
Main boom working condition_No arm end pulley HB/1_55t+21t main boom main hook performance
Operating radius(m) 17 20 23 26 29 32 35 38 41 44 47 50
5 200
1. When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2. The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.